Excavation, Grading & Demolition · Property Services

Lot Grading & Pad Preparation

A building pad has to be level, firm and drained before anything goes on it. Grading moves earth to the right shape, and compaction makes it strong enough to carry a structure. NorTech connects you with a verified licensed earthwork contractor who studies the plans and the lot and bids the grading in writing, including testing and erosion control.

Pricing set by local pros
60-day warranty
Before & after photos
Background checked
Book Lot Grading & Pad Preparation
Tell us about the job
Up-front — no surprises
Your pro backs the work for at least 60 days
Background-checked pros
Before & after photos

Need more hands? Pick a company that sends crews and choose how many technicians. Want a second pro for a different job? Add one right after you book.

Book several services with one pro. Pros set their own bundle discounts.
Compare Bids
Bigger or unusual job? Local pros bid on it and you pick who does the work.
See pros near you

Plans, surveys and elevations

Grading follows a plan that shows existing and finished elevations, drainage paths and the building footprint. The contractor sets stakes from the survey and checks grades regularly with laser or GPS equipment. Cut and fill balance matters: moving soil around the site is cheaper than importing or exporting large volumes. Questions about neighbors, easements and setbacks are resolved before the first scoop. Bring the grading plan, the soils report and the survey to the first meeting, so the contractor can compare them with what they see on the ground.

Compaction, testing and stable pads

Fill soil is placed in thin lifts and compacted with rollers to a specified density, often verified by a soils engineer. Poorly compacted fill settles and cracks slabs. Soft or organic soil is removed. Tests and reports are kept for the building department and lender. Weather affects soil moisture, so the schedule allows for drying or wetting as needed. Ask who orders the compaction tests and how quickly results come back, because the pad cannot be signed off until the density numbers pass.

Drainage, erosion control and handoff

Rough grading directs water away from the pad through swales and berms, and temporary erosion controls such as wattles and silt fence keep soil on site during rain. Many jurisdictions require a stormwater plan. At handoff, the pad is staked for foundation work, with elevations documented. Ask for photographs and compaction reports for your records. Keep the soils engineer’s letter, compaction reports and photos in one folder, since the inspector and the lender may both ask for them.

When to book lot grading & pad preparation

You are preparing a lot for a new home.
A building pad needs to be leveled and compacted.
You are building a detached garage or ADU on a slope.
The lot has drainage problems before construction.
Soil must be shifted around the property.
A soils engineer requires compaction testing.
60-Day Warranty
Backed by your provider’s warranty. If covered work fails, your provider makes it right — free.

Frequently asked

Lot Grading & Pad Preparation — common questions

Slope, soil, volume of earth moved and access vary by site. A contractor needs the plans and a site walk to price it. Ask your provider to confirm the details in writing before work starts.

Often, especially for larger volumes or hillside lots. The contractor can help with the application and erosion control plan. Keep copies of invoices and reports with your home records for future reference.

A soils engineer or testing lab measures density in the field and issues reports. Keep them for the building inspector and lender. Timing can vary with weather, access and permits, so ask for a realistic window.

A small building pad can be graded in a few days, while a larger lot or a hillside site may take several weeks. Soil testing, rain and drying time between lifts set the pace more than machine time does.

Many places require erosion and sediment control during grading. The contractor installs and maintains them. Timing can vary with weather, access and permits, so ask for a realistic window.

The contractor guarantees its grading to the agreed elevations for 60 days. Settlement from unreported soil conditions or later modifications by others is not covered.

Didn’t find your answer? Nova, our AI assistant, is in the chat bubble in the bottom-right corner and can help anytime.

What homeowners say

Lot Grading & Pad Preparation reviews

Verified reviews from every city where NorTech connects customers with providers will appear here.

Be the first lot grading & pad preparation review

Your pro backs the work with a workmanship warranty — if covered work is not right, your pro makes it right, free. Book with confidence and tell the Bay Area how your pro did.

Book Lot Grading & Pad Preparation

Check your coverage

Is Lot Grading & Pad Preparation available near you?

NorTech connects you with vetted local providers for lot grading & pad preparation. Enter your ZIP to check coverage and see your price.

Are there pros in your area?

Enter your ZIP code and we’ll point you to your local hub.

or search your city
AthertonPortola ValleyWoodsideLos Altos HillsHillsboroughBelvedereTiburonRossSan FranciscoPalo Alto

Browse the full coverage area →

Explore more

Related home services

Homeowners who book lot grading & pad preparation often need a hand elsewhere too. Browse related NorTech services — pricing set by local pros, vetted local providers, and a guarantee or warranty suited to each service.

Excavation for Foundations & Additions

Excavation for foundations, additions and new structures by a licensed earthwork contractor: lay…

Learn more

Utility Trenching (Water, Sewer, Gas & Electric)

Trenching for water, sewer, gas and electric lines by a licensed contractor, with correct depth,…

Learn more

Driveway Removal & Regrade

Removal of old driveways and regrading of the surface by an earthwork contractor: demolition, ha…

Learn more

Hillside Stabilization & Slope Repair

Hillside stabilization and slope repair by a licensed contractor: regrading, drainage, retaining…

Learn more

Culvert & Drainage Pipe Installation

Culvert and drainage pipe installation by a licensed earthwork contractor for driveways, ditches…

Learn more

House & Structure Demolition

Demolition of houses and large structures by a licensed demolition contractor: surveys, permits,…

Learn more

Garage & Detached Structure Demolition

Demolition of garages, sheds and detached structures by a licensed contractor: permit checks, sa…

Learn more

Land Clearing & Stump Removal

Land clearing and stump removal by an earthwork contractor: brush, small trees, stumps and roots…

Learn more

Excavated Soil Haul-Off & Fill Delivery

Soil haul-off and clean fill delivery by an earthwork contractor: trucking excavated dirt away,…

Learn more

Book in minutes

Ready to book lot grading & pad preparation?

Choose a background-checked local provider, see your price the moment you enter your ZIP, and lock in a time that works — backed by your pro’s 60-day workmanship warranty.

Book Lot Grading & Pad PreparationCompare Bids
Prefer to compare bids yourself?Get quotes from independent local contractors — you pick who does the work.Compare →